Home / Projects

Projects

Work that proves the point.

Selected projects showing scale, sequencing, technical judgement, preparation, interfaces, programme management and finish. Sensitive client information stays deliberately limited.

More commercial work

Packages, programmes and awkward bits.

Southall Cat A reinstatementInternational Trading Estate · Southall

Cat A reinstatement

Temporary heating was required to maintain minimum installation temperatures during an unusually cold period. The job was recorded from bare substrate through installation to completion.

Carpeted warehouse in SouthallInternational Trading Estate · Southall

An entire warehouse in carpet

A costume supplier to the film industry wanted the whole warehouse carpeted to reduce dirt transfer onto stock. Minimal preparation, large-area installation and a very unusual brief.

Herringbone flooring in VictoriaVictoria · London

Project acceleration

A team of four wood fitters and one carpet fitter was brought in to accelerate an existing project. The herringbone field was straightforward; a different-thickness border and very few right angles made the perimeter the real work.

Old Jewry communal staircaseOld Jewry · London

Communal stair refurbishment

Complete strip-out, new carpet and nosings, housekeeping and waste removal over two weekends. The existing flooring was particularly difficult to uplift.

Primech HQ flooringPrimech HQ · Gillingham

Resolving detail on site

Limited final detailing meant setting-out and interfaces had to be resolved practically on site. The package also included individually manufactured premium carpet tiles.

Office completed on a SaturdayCommercial office · location withheld

Friday builder finish. Monday client move-in.

The flooring window was Saturday. The office went from bare substrate to completed carpet tile in time for occupation on Monday.

Technical detail

The bits that make the finished floor work.

Laser set-outFinished vinyl area
St Paul’s Girls’ School · Hammersmith

Laser-set vinyl capping

A fixed laser datum keeps the capping level even when the subfloor is not. Following the floor with a gauge can simply reproduce its variations at the wall.

Sled track floor build-upAmor Training · Hardwick

Matching dissimilar floor levels

The rubber perimeter tiles sat significantly higher than the sled-track finish, so a contained smoothing-compound build-up was formed to bring the two systems together cleanly.

Entrance matting systemSlough · Bowden Moss

Multi-finish Cat A package

Entrance matting, carpet tiles to offices and stairs, and vinyl to toilets as part of a wider warehouse refurbishment.

Tender / enquiry

Got a project to price?

Send the scope, drawings and programme and we’ll start with what matters.