International Trading Estate · SouthallCat A reinstatement
Temporary heating was required to maintain minimum installation temperatures during an unusually cold period. The job was recorded from bare substrate through installation to completion.
Home / Projects
Projects
Selected projects showing scale, sequencing, technical judgement, preparation, interfaces, programme management and finish. Sensitive client information stays deliberately limited.

Night working and sequencing to help keep a complex SEGRO refurbishment moving.

US-specified imported vinyl tile, environmental controls and material reuse in the offices.

Multiple floors, floating timber, stairs, entrance matting and difficult central-London logistics.

Pre-made timber panels that needed dismantling and reworking to keep the pattern true.

Phased installation around retained desks and live-office constraints.

One-night specialist installation using carpet well beyond conventional floor surfaces.
More commercial work
International Trading Estate · SouthallTemporary heating was required to maintain minimum installation temperatures during an unusually cold period. The job was recorded from bare substrate through installation to completion.
International Trading Estate · SouthallA costume supplier to the film industry wanted the whole warehouse carpeted to reduce dirt transfer onto stock. Minimal preparation, large-area installation and a very unusual brief.
Victoria · LondonA team of four wood fitters and one carpet fitter was brought in to accelerate an existing project. The herringbone field was straightforward; a different-thickness border and very few right angles made the perimeter the real work.
Old Jewry · LondonComplete strip-out, new carpet and nosings, housekeeping and waste removal over two weekends. The existing flooring was particularly difficult to uplift.
Primech HQ · GillinghamLimited final detailing meant setting-out and interfaces had to be resolved practically on site. The package also included individually manufactured premium carpet tiles.
Commercial office · location withheldThe flooring window was Saturday. The office went from bare substrate to completed carpet tile in time for occupation on Monday.
Technical detail


A fixed laser datum keeps the capping level even when the subfloor is not. Following the floor with a gauge can simply reproduce its variations at the wall.
Amor Training · HardwickThe rubber perimeter tiles sat significantly higher than the sled-track finish, so a contained smoothing-compound build-up was formed to bring the two systems together cleanly.
Slough · Bowden MossEntrance matting, carpet tiles to offices and stairs, and vinyl to toilets as part of a wider warehouse refurbishment.
Tender / enquiry
Send the scope, drawings and programme and we’ll start with what matters.