Factory-made didn’t mean installation-ready.

High-end flooring work at Pennyhill Park combining a wave-pattern carpet area with detailed patterned timber.

Timber panels1m × 1m pre-made
Challengepanels not square
Solutiondismantle & rejoin
Settinghigh-end venue
Pennyhill Park
01

The challenge

The patterned timber arrived as pre-made 1m × 1m panels. In practice, a number were not sufficiently square to achieve clean alignment straight out of the box.

02

The delivery

Sections were dismantled, adjusted and reassembled on site so the pattern and joints would run correctly. The job also included a separate wave-pattern carpet installation within the same project.

03

The result

A detailed finish achieved by treating factory-made panels as a starting point rather than assuming they were installation-ready.